The Real Cost of Losing Equipment in a Groundwater Monitoring Well
What does losing a bladder pump, bailer, SOLINST, GEOTECH or QED pump in a 2 or 4 inch groundwater monitoring well actually cost? Full breakdown — equipment replacement, field labor, project delays, and well abandonment costs from $8,000 to $40,000.
Monitoring Well Equipment Retrieval — The Complete Field Guide — Everything environmental field teams need to know about recovering lost equipment from 2, 4, and 6 inch monitoring wells.

