The Real Cost of Losing Equipment in a Groundwater Monitoring Well

The Real Cost of Losing Equipment in a Groundwater Monitoring Well

What does losing a bladder pump, bailer, SOLINST, GEOTECH or QED pump in a 2 or 4 inch groundwater monitoring well actually cost? Full breakdown — equipment replacement, field labor, project delays, and well abandonment costs from $8,000 to $40,000.

Read More