The Real Cost of Losing Equipment in a Groundwater Monitoring Well

The Real Cost of Losing Equipment in a Groundwater Monitoring Well

What does losing a bladder pump, bailer, SOLINST, GEOTECH or QED pump in a 2 or 4 inch groundwater monitoring well actually cost? Full breakdown — equipment replacement, field labor, project delays, and well abandonment costs from $8,000 to $40,000.

Read More
What to Do When Equipment Falls Down a Groundwater Monitoring Well

What to Do When Equipment Falls Down a Groundwater Monitoring Well

Lost a bladder pump, bailer, transducer or SOLINST, GEOTECH or QED pump in a 2 or 4 inch groundwater monitoring well? This field guide covers what to do, why improvised retrieval fails, how the Extraction Kit retrieves lost equipment, and when well abandonment may be unavoidable.

Read More

Monitoring Well Equipment Retrieval — The Complete Field Guide — Everything environmental field teams need to know about recovering lost equipment from 2, 4, and 6 inch monitoring wells.